2013-12, Generator for E911 |
Click Here |
2013-10, Fidelity Bonds for County Employees |
Click Here |
2013-09, Demolition of Building at 3491 Main Street
Environmental Report
Addendum # 1
Bid Tabulation
|
Click Here
Click Here
Click Here
Click Here
|
2013-05, Berley Road Bridge Replacement
Plans & Drawings
Sign In Sheet |
Click Here
Click Here
Click Here |
2013-06, Type 1, Class 1 Ambulance
Addendum # 1 & Drawings
|
Click Here
Click Here |
2013-07, IFB for Pre-qualified bidders, Newberry County Sheriff Office
Sign In Sheet
Addendum # 1
Addendum # 2
Addendum # 3
Bid Tabulation |
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2013-02, Whitmire Armory EMS Renovation
Specifications
Drawings
Addendum # 1
Notice: Correct bid form to be submitted is on website listed under the Addendum #1 tab as “Invitation for Qualified Bidders”
Addendum # 2
Sign In Sheet |
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2013-04, Front Wheel Loader
Notice: The County has suspended awarding this bid |
Click Here |
2013-03, Newberry County Sheriff Office Project
Prequalification for Bidders
Contractor Qualification Statement
Addendum # 1
Responses
|
Click Here
Click Here
Click Here
Click Here |
2012-39, Airport Storm Water Sampling and Inspections
Stormwater Pollution Prevention Plan
Spill Prevention, Control and Countermeasures Plan
GIS Link - TMS 284-2-7
Addendum # 1
Responses |
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-36, Tree Cutting Services at Lynches Woods
Bid Tabulation
Notice To Proceed |
Click Here
Click Here
Click Here |
2012-37, Whitmire Armory Roof Replacement
Specifications
Sign In Sheet
Addendum # 1
Drawings
Bid Tabulation |
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-34, Old Library Roof Replacement
Environmental Report
Sign In Sheet
Bid Tabulation
|
Click Here
Click Here
Click Here
Click Here |
2012-32, Whitmire Town Hall (Old Baker Building)
Drawings
Specifications
Sign In Sheet
Environmental Report
Bid Tabulation
Notice To Proceed
|
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-33, Landscaping-Maintenance on Hwy 219 Interchange
Addendum # 1 |
Click Here
Click Here |
2012-31, Opera House Roof Replacement
Original Roof Drawings
Sign In Sheet
Addendum # 1
Bid Tabulation |
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-30, Permit Tracking System
Q&A
|
Click Here
Click Here |
2012-28, Veteran's Affairs Up-Fit
Drawings
|
Click Here
Click Here |
2012-26, Courthouse Roof Replacement
Drawings
Addendum # 1
Minutes From Pre-Meeting
Addendum # 2
|
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-27, Newberry Square Parking Lot Paving
Plan Set
Layouts
Sign In Sheet
Addendum # 1
Addendum #1 Sketches
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-24, Digital Orthoimagery Services
Addendum # 1
Responses |
Click Here
Click Here
Click Here |
2012-15, Title Searches |
Click Here |
2012-14, IFB for Whitmire Library Renovations(Rebid)
Specifications
Drawings
Sign In Sheet
Addendum # 1 |
Click Here
Click Here
Click Here
Click Here |
2012-23, Engineering Services for Parking Lot Improvements at Newberry Square
Responses |
Click Here
Click Here |
2012-22, IFB for interior up-fit for Voter Registration
Specifications
Drawings
Sign In Sheet
Bid Tabulation
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-21, IFB for Carpet Replacement at Newberry Opera House
Drawings
Environmental Report
Addendum #1
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-20, IFB for Carpet Removal Courthouse Lower Level
Lower Level Floor Plan
Bid Tabulation
|
Click Here
Click Here
Click Here |
2012-18, IFB for Pomaria Fire Department Sub Station Metal Building (Rebid)
Addendum # 1
Bid Tabulation
|
Click Here
Click Here
Click Here |
2012-19, IFB Tree Removal Services
Mandatory Pre-Bid Conference
Bid Tabulation
|
Click Here
Click Here
Click Here |
2012-17, Whitmire Rescue/EMS Interior Material Removal
Asbestos & Lead-Based Paint Survey Report
Bid Tabulation
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here |
2012-16, Newberry County Old Library Interior Material Removal
Asbestos & Lead-Based Paint Survey Report
Bid Tabulation
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here |
2012-15, IFB for Pomaria Fire Department Building
Bid Tabulation
Bid Rejection |
Click Here
Click Here
Click Here |
2012-14, IFB for Whitmire Library Renovations
Specifications & Drawings
Pre-Bid Sign-In Sheet
Addendum #1
Bid Tabulation |
Click Here
Click Here
Click Here
Click Here |
RFQ 2012-13, Pre-Qualify Bidders for Courthouse Renovations
Pre-Qualification Submittal Form
Mandatory Prebid Meeting Notification
Pre-Bid Sign-In Sheet
Environmental Report
Addendum #1
Bid Rejection
|
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
|
2012-10, Public Works Complex
Specifications & Drawings
Pre-Bid Sign-In Sheet
Geotechnical Exploration Report
Addendum #1
Addendum #2
Revised Civil Drawings
Addendum #3
Revised Bid Documents
Bid Tabulation
Notice of Intent to Award
|
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
|
2012-07, Bush River Fire Department Building
Addendum #1
Bid Tabulation
|
Click Here
Click Here
Click Here |
2012-11, A/E Services for Sheriff's Office
Addendum #1
Responses |
Click Here
Click Here
Click Here |
2012-12, Clemson Extension Up-Fit
Specifications
Drawings
Stud Sizes Sketch
Frame Sketch
Fire Sprinkler Spec Sheet
Sign-In Sheet and Addendum 1
Bid Tabulation
Notice of Intent to Award |
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here |
2012-09, Narrow Banding Project
Mandatory Pre-Bid Conference Attendees
Addendum #1 |
Click Here
Click Here
Click Here |
2012-08, Inmate Telephone System
Mandatory Pre-Bid Conference Attendees |
Click Here
Click Here |
2012-02, Proposal for Auctioneering Services |
Click Here |
2012-05, Asbestos and Lead Paint Removal
Environmental Report
Results
|
Click Here
Click Here
Click Here |
2012-04, Carpet Cleaning Services |
Click Here |
2012-03, Emergency Medical Vehicle
Addendum
Drawings
Questions and Clarifications
Bid Tabulation
Notice of Intent to Award
|
Click Here (Revised Version)
Click Here
Click Here
Click Here
Click Here
Click Here |